Disable Oracle Hospitality OPERA Integration

If you want to pause the integration with Oracle Hospitality OPERA, you can disable the integration on Yeastar P-Series Software Edition.

Procedure

  1. Log in to PBX web portal, go to Integrations > PMS.
  2. Turn off the PMS Integration switch on the top.

  3. Click Save.

Result

  • The Status field displays Disabled.

    When specific events (such as check-in) occur, the PBX will NOT synchronize with OPERA PMS.

  • The integration configurations are retained, and can be used directly the next time the integration is enabled again.